
Strategic data center campus development opportunity in Riga, offering a rare combination of scale, grid proximity and long-term power expansion potential in the Baltics.
TOTAL RESERVED
grid capacity
4 EXISTING INDUSTRIAL
BUILDINGs AREA
INDUSTRIAL site area
+10 HA POTENTIAL
Total reserved grid capacity
Available in 2027
Available in 2028
4 existing industrial buildings perfectly suitable for data center conversion
1.5 km from Riga TEC-2
3 fibre providers ~8.3 km to the Core IXP
Buildings, electrical infrastructure and cooling tailored to operator requirements
Industrial zoning supports backup generators, UPS and battery storage systems

15 Granita Str. is located 2.5 km from Riga TEC-2 — Latvia's largest CHP power plant with up to 881 MW of electrical capacity, supporting the site's potential for phased data center development up to 180 MW.







SELECT HALL TO EXPLORE DETAILS
TOTAL FLOOR AREA
MAIN HALL
HALL HEIGHT

TOTAL FLOOR AREA
MAIN HALL
HALL HEIGHT

TOTAL FLOOR AREA
MAIN HALL
HALL HEIGHT

TOTAL FLOOR AREA
MAIN HALL
HALL HEIGHT





Four independent 180 MW power supply connections, providing a highly resilient power infrastructure with full redundancy in case any
individual line becomes unavailable.
The site is designated for industrial use, allowing the installation of large-scale UPS systems, battery energy storage systems (BESS), and high-capacity diesel backup generators.
As the site is located within an industrial zone rather than a city center, there are significantly fewer restrictions on the installation and operation of critical power infrastructure.
The site offers strong potential for water-based cooling solutions, while proximity to Riga’s district heating network creates an opportunity for recovered heat offtake, supporting efficient and sustainable operation.
Latvia is connected to European fibre routes toward the Baltics, Poland, Germany and Scandinavia, supporting low-latency regional and international connectivity.
LNK Industries is one of Latvia’s leading industrial construction groups, with experience in complex industrial, utility and electrical infrastructure projects.
Latvia applies 0% corporate income tax on reinvested profits, generally arising when profits are distributed.
As an EU and NATO member state, Latvia also provides a stable European legal and investment environment.
Includes wholesale electricity price (2026 YTD average), TSO transmission/grid tariff and electricity tax. Excludes supplier margin, VAT and other levies. Source: ENTSO-E, ACER, European Commission, national regulators (2026 YTD). Indicative for large consumers (e.g. data centers). Rounded figures. September 2026.
Recent annual average
The area is served by three fibre providers and multiple independent routes, providing resilient and redundant connectivity infrastructure.
The site is located approximately 8.3 km from the national Core IXP point.
Riga is connected to Nordic and major European digital hubs through strong terrestrial fibre infrastructure and a subsea route to Sweden.
Riga provides access to a national IXP and a carrier ecosystem of 40+ network operators, supporting scalable regional and international connectivity.